Peak District Group 15th-17th June 2011

Peak District Group 15th-17th June 2011
The Troop

Tuesday 21 June 2011

Day 3 17th June 2011 the Last Day

Well here it is the last day of our residential we did not have to be up till 8 this morning and when we got up we shower and had breakfa
                            
                                                       Josh Smashing a Coffee
After breakfast we began to brake camp and pack away all our equipment and move our gear down to the big tent located near the staff tents
                                             Adam and Mikeys tent packed away

                                                Everyone begins to pack

   Tents are packed away

Working as a team



                                                      All Packed Up

We then moved down with our kit to the staffs tent area and where given a final parade we where told the good points and what went well during our college residential we all thoroughly enjoyed our trip to the peak district we then had a final troop picture to round up our trip
                                                Week 2 15th to 17th June 2011 

While waiting for the coach to arrive we managed to have a quick couple of games before heading back to college
a Awsome ending to a Awsome Residentail

We set off from the campsite and head back to college we arrived just after 12 the residential was over a good end to our first year

Day 2 16th June 2011

  Second day today woke up about 6:30 it rained lasty night but all of our kit managed to stay dry bonous !!!! we brewed up and had breakfast and head of four the showers, we where all set to rock and role by 8.

          
                                                         mikey with his moarning brew
Ready to move out



The Maps and Route for Day 2


Route out , Route Card

Leg
Start Grid
Finish grid
Bearing (MAG)
Distance
Time
Height + or -
Description of route

1






243 623
Barn Farm
Camp Site

253 637
Road/track junction

038*

2200m

35min

    ___
From campsite head in an Easterly direction passing farm on left. Continue on and around the top of re-entrant path veers off NE until it meets minor road. Follow road NE steep decline into village pass church on right take left hand fork heading NE then turn left at junction heading North for 400m, pick up footpath heading NE from road.


2




253 637
Road/track junction

257 656
Road/track junction

010*

2100m

35min
+ 10min
stop

+70
Moving NE handrail Hillcarr Wood on RHS for 500m. Track heads N through collection of buildings with small wood to right. Moving into a clearing for 100m then back into wooded area for 300m. Track veers E then N for 600m minor road meets metalled road.


3





257 656
Road/track junction

257 681
Road/track junction

000* (N)

2400m

40min

+40
Head N over bridge through village pick up footpath running to the S side of the church. Tack runs NE passing wooded area after 300m. Keep River Derwent to RHS at all times, wood will appear on higher ground to left River to the right. Move for 1K keeping wood to left on a Northerly bearing following track. Track then veers off to NW track leads down to metalled road.


4






257 681
Road/track junction

257 701
Chatsworth Bridge

358*

2000m

32min

+10
Move N on minor road moving E after 150m. After another 150m move N on the road for 400m cross 6012 and pick up footpath moving N keep River to right until you reach Chatsworth House bridge.






152
min
+ 120m





                                                                 Return Route Card

Leg
Start Grid
Finish grid
Bearing (MAG)
Distance
Time
Height + or -
Description of route

5






257 701
Chatsworth Bridge


257 681
Road/track junction



178*

2000m

30min

 _____
From Chatsworth House bridge move S keeping river Derwent to left following footpath. Cross the 6012 move S for 400m then veer W for 150m then S for 150m where minor road meets metalled road and footpath heading S


6




257 681
Road/track junction



257 656
Road/track junction

180*

2400m

36min
+ 10min
stop

_____
Continue to move S on track keeping Lindop wood on RHS River veers off E at this point. Keep wood on high ground to the right for approx 1K where you should meet back up with River. Handrail River to left for 700m small wood should be on RHS for 150m River to left. 250m to church on RHS, cross bridge pick up road running S out of village after 300m road bends to W track continues to run S.


7





257 656
Road/track junction

253 637
Road/track junction

190* (N)

2100m

40min

_____
Move S on bearing for approx 600m track veers W for 100m then S through wooded area clearing for 100m then move S through a collection of buildings, 200m to Hillcarr Wood handrail for approx 500m until you reach minor road.


8






253 637
Road/track junction

243 623
Barn Farm
Camp site

218*

2200m

32min

+ 50m
Heading in a southerly direction for 200m road veers SE 200m to T junction take the RH turn heading SW for 300m church on left climb out of village for approx 1K. Pickup track that heads S to Barn Farm for 300m head west at building further 200m to camp site.







162
min
+ 50
































We set off just after 8 and headed towards Chatsworth and just like the second day we coverd most of the distiance in realy good time. On route was past the nine ladys.
the Nine Ladies


The nine ladies are a popular site for modern-day pagan worship.
During the route to Chatsworth we stopped at various intervals and took it in turn to navigate the route each person would have to orientate the map to group and then show where on the map they where.
Lewies Navagating

We passed over different tertian and landscapes

Woods on Route

We the total distance of the walk was 20km and we where all looking foarwd to getting stuck in the water activaties

                                                                    On Route


Before we reached our location we had a quick water brake at the top of one of the hills, when reached the location we had a lunch brake and had something to eat and drink

                                                                    Snack Time

we then got changed into our clothes that we would be using during the water activaties martin gave us a brife on what we had to do.
The first detail consisted of those who where not confident in the water they they had to go out into the center of the lake and then return to the sure. The second detail consisted of those who where confidenent in the water and would battel it out in the ceneter!!
Raft Building Equipment

The first job was to construct a raft that we would sail on this was made up from barrales planks and rope. Our first attemeped would have found is collapsing on luanching it but on our second attempt we made a fantatic raft we where ready for the water sports.

Team Work at its Finest


Take  two the newer improved model

After the construction of our rafts we were ready to begin we launched our rafts into the water and moved into the centre then the battle began we all fell in water and had a right laugh
                                                              Ready For Luanching
                                                   


                                                       Adam
                                                           Lewis
                                                                 Mikey


The Raft Failed but it was realy good fun


After we pulled out all the gear from the broken raft we swam ashore we then placed all the equipment in piles ready for loading onto the trailer. We then got changed into our fresh gear and got ready for the long walk back to camp stopping off at the same check points for water and refreshment brakes.

                                                    Quick Water  Brake

Well we arrives back at camp first again we where lucky because as we just entered our tent there was a really bad down poor the weather was touch and go all day but the worst of the rain came when where under cover. We received a debrief from the staff on how well we adopted our map and compass and expedition planning lessons to a practical scenario 
                                           View of campsire facilaties
When we got back we took care of our personal administration got showered and we where now ready for our final night barbecue that was cooked by the staff

During the evening we had some down time we occupied this with team ball games during the course of the night we gathers in the games room and played pool tournaments and air hockey and reflected on the best moments of the day =) we all became closer over the course of the last couple of day it was a fantastic end to a perfect day

                                             The Games Begin
After a very eventful day we slept soundly in our tents!!!!